Cambodia Recipe Box. Baijiu Cocktail Recipe Box. Portland Foodie Box. Become An Affiliate. January 3, Article by Lost Plate Food Tours. Cambodia , Phnom Penh. Pin it. Share on pinterest. Share it. Share on facebook. Share on twitter. Share on whatsapp. Share on email. Cerevisia Craft Brewery. Riel Brewing.

Hops Brewery. This is also the only air-conditioned venue, which also has nice pool tables and darts inside. Himawari Microbrewery. Kingdom Brewery. Related Posts:. October 24, October 17, Visit Our Blog. Sign up for our newsletter! Your Name. Food Tour Locations. Caravan pitch socket-outlets are required to comply with BS EN and must have a degree of protection of at least IP The current rating is to be not less than 16 A but may be greater if required.

At least one socket-outlet should be provided for each caravan pitch. Where socket-outlets are grouped in pitch supply equipment, there should be one socket-outlet for each pitch limited to a group of four. To be compatible with the caravan connecting cable, socket-outlets should be two-pole with the earthing contact having key position 6 h.

Each socket-outlet must be protected individually by an overcurrent device, which may be a fuse but is more usually a circuit-breaker, and individually by an RCD having the characteristics specified in Regulation The RCD must disconnect all live conductors including the neutral. If the caravan supply is derived from a permanent building that is supplied by a PME system then the caravan supply will have to be part of a TT system having a separate connection to Earth independent from the PME earthing.

The separation of the earthing can be effected at the main distribution board. See the below Figure 7. This enables the exposed-conductive-parts connected to each system to be more readily identified and inspected periodically. An earth electrode for the TT system should be provided nearby and located so that the resistance areas of the PME supply earthing and earth electrode do not overlap.

Alternatively, the separation of the earthing can be made at the caravan pitch supply points. In this instance, earth electrodes will be required at these points. The wiring system must include a circuit protective conductor connected to:. An RCD is a protective device used to automatically disconnect the electrical supply when an imbalance is detected between live conductors.

In the case of a single-phase circuit, the device monitors the difference in currents between the line and neutral conductors. If a line to earth fault develops, a portion of the line conductor current will not return through the neutral conductor. The installation to the caravan should have a main disconnector, which will disconnect all the live conductors. This should be placed in a suitable position for ready operation within the caravan to isolate the supply.

When a caravan only has one final circuit then the isolation can be afforded by the overcurrent protective device as long as it fulfils the requirements for isolation. An indelible notice in the appropriate language s must be permanently fixed near the main isolation point inside the caravan to provide the user with instructions on connecting and disconnecting the supply refer to Figure of BS The inlet to the caravan must be an appliance inlet complying with BS EN This should be installed not more than 1.